Easy Step-by-Step Instructions for Installing DIY CoolRoom Kit

Our DIY CoolRoom Kits are fast and easy to assemble, and only require a few basic tools such as a screwdriver, a drill and a blind riveter.diyCOOLROOM

As well as this, our CoolRoom Kits are:

  • Very affordable & high value for money
  • High quality
  • We can custom make a variety of different CoolRoom Kit sizes. As part of our great pricing policy, we don’t charge you for the additional labour or time costs used, only for the additional materials
  • We use 100mm Energy-Efficient Polyurethane Panels for all of our Coolrooms and Freezers
  • We also offer a free Design Consultation before purchase to make sure you get what you need

Video: Quick & Easy 7 Minute DIY Kit Installation  Find out more about how to Install your DIY CoolRoom Kit 

Step-by-Step Instructions for Installing DIY CoolRoom Kit:

Preparation

1. Unpack your DIY Kit and find the diagram with the product dimensions
2. The Allen Key is used for locking the panels together (please see dot point 5 for a video showing the Allen Key in action).
3. Cam Locks are the securing devices that the Allen Key locks together. Please check that all of the Cam Locks are working - this just means checking that the Allen Key opens and closes them properly - we are not putting the panels together yet in this step
4. Every time that you use the Allen Key to lock panels together, check that the panels are pulled together very closely. The panels should also make a clicking noise when they are locked
5. Every time you join any of the panels together, make sure the panels are fully level for all of the different dimensions (important). You can use your body weight to make sure this happens, although please don’t use machinery like a forklift

Installation of Main Floor and Walls

1. Join the floor panels together, although don’t lock them together yet
2. Use the Allen Key to lock the floor panels together tightly
3. Next, fit the first corner panel to the floor by standing the corner panel at the corner of the floor panels.
4. Please lock the corner panel and floor panels tightly with the Allen Key
5. Stand the back wall panel next to your corner panel
6. Use the Allen Key to lock the back wall and corner panels together tightly
7. You may need to use force to get the walls straight & the roof panel in the track. You can do this using your hands or body weight, although please do not do this with machinery (e.g. a forklift)
8. Install the rest of the wall and corner panels using the same method. Leave the corner panel that is at the corner where the door is closed shut as the last panel
9. Install the section with the door. The door will already be pre-attached to its wall.
10. Put the final corner panel in place and lock this in tightly with the Allen Key

Roof Installation and Completion

1. Place the first roof panel in the track on the top and use the Allen Key to lock it in safely and securely
2. As noted earlier, you may need to use force to get the walls straight & the roof panel in the track. You can do this using your hands or body weight, although please do not do this with machinery (e.g. a forklift)
3. Place the second roof panel in the track on the top and use the Allen Key to lock it in
4. Look at the joints - the long spaces where the panels were joined together. Please put silicon on all the joints between panels, and then clean any excess silicon
5. Please put silicon on the top-facing part of the floor joints, and on the inside and outside of the wall and roof joints.
6. In your Kit are caps to go in the Allen Key holes (the holes where the Allen Key was used to join the panels together). Please put all of these in, without using silicon
7. Finally, please use a certified refrigeration mechanic to install your condensing unit and a qualified electrician to install your lighting switch - do not install these yourself.

Congratulations on the great job - you have successfully installed your budget DIY Cool Room, Cold Room or Freezer Kit!

Special Bonus Feature- Easy Assembling and Disassembling

Our high standard & high quality cool room walls are connected with specially made built-in buckles on the inside- if you need a budget 'second time around', our coolrooms and freezers can be easily assembled and disassembled for new purposes, which can be especially useful if you need this for mobile businesses. Please call us on (03) 9794 9776 if you would like to find out more.

With a huge variety of custom-built sizes, we make sure that our customers have a high quality & high value for money solution that makes full use of their existing fields and structural spaces.

Energy efficiency properties

Our cool rooms, cold rooms and freezers have a variety of excellent energy efficiency features, including

  • Fast speed to low temperature
  • Strong interchange ability from being formed in series
  • Keep temperature stable for a long time
  • Compared with other coolrooms, they save a whopping 30-40% more energy

With a huge variety of custom made sizes, our great quality solutions also provide our customers the convenience to make full use of their existing structural spaces. 

Let us save you money across both the medium and long run by supplying you with high quality energy efficient coolrooms, cold rooms and refrigeration rooms!

Special Properties

We use advanced special compound materials for compound walls that have special temperature preservation properties.

Our polyurethane wall panels are light weight, high strength, have great temperature insulation, are anti-corrosive, age-resistant, moth proof, and mold-resistant.

Contact Details

To enquire about any of our Services or Products, please don't hesitate to:

and our friendly team will be happy to help you with your Cool Room, Cold Room, Refrigeration, Clean Room & Temperature Controlled Room needs!